Author:
Goyal Bharat,Kaur Sukhmandeep
Reference12 articles.
1. Bhatnagar V., Das, G., & Mehta, O.P., “n-job two machine flow-job shop scheduling problem having minimum total waiting time for all jobs”in PAMS, X, 1–2 (1979)
2. Minimizing waiting time of jobs in flow-shop scheduling: A heuristic approach
3. Specially Structured Flow Shop Scheduling Models with Processing Times as Trapezoidal Fuzzy Numbers to Optimize Waiting Time of Jobs
4. Gupta, D. & Goyal B., “Optimal Scheduling For Total Waiting Time Of Jobs In Specially Structured Two Stage Flow Shop Problem Processing Times Associated With Probabilities”, in Aryabhatta Journal of Mathematics & Informatics, 8 (1) (2016), pp 45–52.
5. Minimization of total waiting time of jobs in n 2 specially structured Flow Shop Scheduling with set up time separated from processing time and each associated with probabilities