Author:
Kuswardhani Nita,Purnomo Bambang Herry,Salsabila Nanda Sintya Fitri
Reference16 articles.
1. ANALISA PENINGKATAN MUTU PEMELIHARAAN MESIN TERHADAP KELANCARAN PROSES PRODUKSI PADA PERUSAHAAN DOLOMITE
2. Prabowo R.F., Hariyono H., Rimawan E., "Total Productive Maintenance (TPM) on Grinding Machine Maintenance Using the Overall Equipment Effectiveness (OEE) Method", J Ind Serv, 5(2), 2020.
3. Purnomo B.H., Novijanto N., Maeline F.S.., "Improvement of overall equipment effectiveness (OEE) of grinding machine in chocolate powder production at PT ABC", Agrointek J Teknol Ind Pertan, 17(3):684–94, 2023.
4. Suliantoro H., Susanto N., Prastawa H., Sihombing I., Anita M., "Application Of Overall Equipment Effectiveness (OEE) and Fault Tree Analysis (FTA) Method to Measure The Effectiveness Of Reng Machines", J Tek Ind, 12(2):105–18, 2017.
5. Suwarno A., Rusdi Widya A., Winelda K.A., Marhaban F., "Increasing the OEE Value of Cutting Machines on Line 6 Finishing Using the RCA Method at PT. XYZ", Pelita Ind J Ilm Tek Ind, 1(2):1–18, 2021.