Construction schedules slack time minimizing
Author:
Krzemiński Michał
Reference8 articles.
1. SCHEDULING MODEL OF CONSTRUCTION ACTIVITY WITH TIME COUPLINGS
2. M. Krzemiński, Use of the KASS program in scheduling. Technical Transaction, ISSUE 2-B(6), 2014, pp. 217–224,
3. Bid assessment with the use of fuzzy sets theory
4. M. L. Pinedo, Planning and Scheduling in Manufacturing and Services. Springe, 2009,
5. M. L. Pinedo, Scheduling: Theory, Algorithms, and Systems. Springer, 2012,