Author:
Sathish T.,Premkumar I. J. Isaac,Saravanan R.,Basker Sanjeevi,Parthiban A.,Vijayan V.
Reference70 articles.
1. Cast Off expansion plan by rapid improvement through Optimization tool design, Tool Parameters and using Six Sigma’s ECRS Technique
2. Case Study of Cycle Time Reduction by Mechanization in Manufacturing Environment
3. R. Pugazhenthi, R Saravanan, M. Chandrasekaran, R. Franklin Issac and P. Vivek, “Optimization of Wheel Axle Plant Manufacturing Environment by Simulation”, ARPN Journal of Engineering and Applied Sciences 12, 2412–2418(2017).
4. Improvement of Productivity in TIG Welding Plant by Equipment Design in Orbit
5. M. Swapna Sai, V. Dhinakaran, K. P. Manoj Kumar et al., A systematic review of effect of different welding process on mechanical properties of grade 5 titanium alloy, Materials Today: Proceedings, (2020).
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献