1. A. Azman, K. Anuar, and M. Kamar, “FRAGMENTATION ISSUE IN MALAYSIAN INDUSTRIALISED BUILDING SYSTEM (IBS) PROJECTS,” J. Eng. Sci. Technol., vol. 9, no. 1, pp. 97–106, (2014).
2. M. N. Mohd Nawi, A. Lee, A. Azman, K. Anuar, and M. Kamar, “FRAGMENTATION ISSUE IN MALAYSIAN INDUSTRIALISED BUILDING SYSTEM (IBS) PROJECTS 2. IBS as an Alternative Solution,” J. Eng. Sci. Technol., vol. 9, no. 1, pp. 97–106, (2014).
3. Y. Liu, R. N. Baldwin, and L. Y. Shen, “IDENTIFICATION OF FACTORS INFLUENCING COMMUNICATION BETWEEN PARTICIPANTS IN CONSTRUCTION PROJECTS,” pp. 291–299, (2006).
4. Z. Kamar, K. A. M., Alshawi, M., & Hamid, “BARRIERS TO INDUSTRIALIZED BUILDING SYSTEM (IBS): THE CASE OF MALAYSIA The Problem Statement Research Methodology This paper is a preliminary study to a PhD research on Industrialised Building System,” Int. Postgrad. Res. Conf. (IPGRC 2009), no. 2009, p. (pp. 471–484)., (2010)
5. M. I. Din, N. Bahri, M. A. Dzulkifly, M. R. Norman, K. a M. Kamar, and Z. Abd Hamid, “The adoption of industrialised building system (IBS) construction in Malaysia: The history, policies, experiences and lesson learned,” 2012 Proc. 29th Int. Symp. Autom. Robot. Constr. ISARC 2012, vol. 1, (2012).