Author:
Bera Saikat,Bachwani Dhiraj
Reference17 articles.
1. Randall J. Essex Means of Avoiding and Resolving Disputes During Construction Tunnelling and underground space technology, Volume 11, Number 1, 1996 (CONTRACTING PRACTICES).
2. Marine Echternach--Jauberta*, Robert Pellerina, Laurent Joblotb Litigation management process in construction industry, A Department of Mathematics and Industrial Engineering, Polytechnique Montreal, CP6079 succ. tCentre-ville, Montreal H3C 3A7, Canada b École Nationale Supérieure des arts et métiers, rue porte de Paris, 71250 Cluny, France, Procedia Computer Science 181 (2021) 678–684.
3. ashwama, X.N, Aigbavboa, C and Thwala, D*Investigation of construction stakeholders’ perception on the effects & cost of construction dispute in Swaziland, Department of construction management & quantity surveying/ University of Johannesburg, South Africa Creative Construction Conference 2016, CCC 2016, 25-28 June 2016, Procedia Engineering 164 (2016) 196 – 205
4. Ibrahim Mahamid * Micro and macro level of dispute causes in residential building projects: Studies of Saudi Arabia, Civil Engineering Department, Hail University, Hail, Saudi Arabia, Received 22 October 2013; accepted 4 March 2014.
5. Selection and use of Alternative Dispute Resolution (ADR) in construction projects — Past and future research