1. A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal
2. M. Nageswara Rao. et al, “Simultaneous scheduling in FMS through priority rules” Journal of Advanced Research in Dynamical and Control Systems, Vol 9, pp 1995–2008, 2017.
3. M. Nageswararao et al. “Scheduling of Machines and Automated Guided Vehicles in FMS using Shuffled Frog Leap Algorithm,”. International Journal of Mechanical Engineering and Technology, Vol 8, No 5, pp 496–503, 2017.
4. P.A. Kumar et al, “Scheduling of machines and automated guided vehicles in FMS using scatter search algorithm,” International Journal of Mechanical Engineering and Technology, Vol 8, No5, pp 471–481, 2017.
5. M. Nageswara Rao et al, “Application of BPSO in flexible manufacturing system scheduling,” International Journal of Mechanical Engineering and Technology, Vol 8, No5, pp186–195, 2017.