1. M. R. Abdullah, I. A. Rahman, A. Asmi, and A. Azis, “Causes of Delay in MARA Management Procurement Construction Projects,” J. Surv. Constr. Prop., vol. 1, no. 1, pp. 123–138, 2010.
2. I. B. ISMAIL, “RISK ASSESSMENT OF TIME AND COST OVERRUN FACTORS,” no. October, 2014.
3. Analysis of Time and Cost Overrun in Malaysian Construction
4. Analyzing the dynamics of the global construction industry: past, present and future
5. A. C. R. Van Riel, G. Calabretta, P. H. Driessen, B. Hillebrand, A. Humphreys, M. Krafft, S. F. M. Beckers, A. C. R. Van Riel, G. Calabretta, P. H. Driessen, B. Hillebrand, A. Humphreys, and M. Krafft, “Article information : To cite this document :,” 2013.