Author:
Kadhom Ahmed,Altaie Meervat
Reference18 articles.
1. Impact of Risk on Design-Build Selection for Highway Design and Construction Projects
2. K. Mclain, "Managing Geotechnical Risk on US Design - Build Transport Projects," 2010.
3. F. A. GORDON CULP, P.E., "Alternative Project Delivery Methods for Water and Wastewater Projects: Do They Save Time and Money?," pp. 231–240, 2011.
4. Nature and Causes of claims in Iraqi turnkey projects
5. I. G. Castro-Nova, "Geotechnical risk decision tools for alternative project delivery method selection," MS Thesis, 2016, [Online]. Available: https://lib.dr.iastate.edu/cgi/viewcontent.cgi?article=6898&context=etd.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献