Author:
Hubert Canfield,Gondokusumo Onnyxiforus
Reference9 articles.
1. M. A. Ammar, Optimization of Project Time-Cost Trade-Off problem with Discounted Cash Flow, (ASCE: Journal of Construction Engineering and Management, 2011), 107(2): pp. 247–261
2. S.S. Liu and C.J. Wang, Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow, (ASCE: Journal of Construction Engineering and Management, 2010), 136(12): pp. 1268–1278.
3. G. Lucko, Productivity Scheduling Method Compared to Linear and Repetitive Project Scheduling Methods, (ASCE: Journal of Construction Engineering and Management, 2008), 134(9): pp. 711–720.
4. G. Lucko, Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions, (ASCE: Journal of Construction Engineering and Management, 2009), 135(4): pp. 246–253.
5. G. Lucko and A. A. P. Orozco, Float Types in Linear Schedule Analysis with Singularity Functions, (ASCE: Journal of Construction Engineering and Management, 2009), 135(5): pp. 368–377.