Author:
Shanthi R. Sathiya,Meganathan R.,Jayakumar S.
Reference22 articles.
1. The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time
2. A Heuristic Algorithm for thenJob,mMachine Sequencing Problem
3. C. Chia and W. Lee, “Minimizing the total completion time in permutation flow shop,” Comput. Oper. Res. 6, 2111–2121 (2008).
4. R. W. Conway, W. L. Maxwell and L.W. Miller, Theory of scheduling (Dover Publications, INC, 1967).
5. An Evaluation of Flow Shop Sequencing Heuristics
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献