1. P. D. S. Situmorang, Syahrizal, and I. Jaya, “Analisa Penjadwalan Proyek Dengan Time Schedule Kurva S, Precedence Diagram Method (PDM), Dan Ranked Positional Weight Method (RPWM),” J. Tek. Sipil USU, vol. 6, no. 1, 2017.
2. T. E. Uher, Programming and Scheduling Techniques, vol. 4, no. 1. 2003.
3. Project Schedule Forecasting for Skyscrapers
4. D. Taurusyanti and F. L. E-issn, “Dewi Taurusyanti dan Muh. Firki Lesmana E-ISSN 2502-5678,” vol. 1, no. 1, pp. 32–36, 2015.
5. I. Agustiar and R. Handrianto, “Evaluasi Penjadwalan Proyek Menggunakan Metode CPM dan Kurva S (Studi Kasus : Pembangunan Gedung Perpustakaan SMK N 1 ‘XX’, Gresik),” Wahana Tek., vol. 07, no. 02, pp. 99–105, 2018, [Online]. Available: http://journal.unigres.ac.id/index.php/WahanaTeknik/article/view/788.