Author:
Noviyarsi ,Yulius M. Nursyaifi,Mutiara Eltira
Reference9 articles.
1. Ramani, Tanmay & Ramesh Kannan, Schedulling Of Industrialized Construction Project using Graphical Evaluation and Review Technique (GERT). Proceedings of Second International Conference on Advances In Industrial Engineering Applications (ICAIEA2014), Anna University, January 6-8, 2014.
2. Aliyu, A. M., Project Management Using Critical Path Method (CPM) : A Pragmatic Study, Global Journal of Pure and Applied Science, 2012, Vol.18 No. 3&4, pp. 197–206.
3. Trietsch, Dan and Kenneth R. Baker, PERT 21 : Fitting PERT/CPM for Use in The 21st Century, International Journal of Project Management (Elsevier, 2012), Vol. 30, pp. 490–502.
4. OPTIMIZATION OF TIMES AND COSTS OF PROJECT OF HORIZONTAL LAMINATOR PRODUCTION USING PERT/CPM TECHNICAL
5. Kholil, Muhammad, Bonitasari Nurul Alfa, and Madjumsyah Hariadi, Scheduling pf House Development Projects with CPM and PERT Method for ime Efficiency (Case Study : House Type 36), IOP Conference Series : Earth and Environmental Science 140 (IOP Publishing, 2018).