Author:
Djatmiko Bambang,Ichwanto Muhammad Aris,Revantoro Bambang,Nawi Mohd Nasrul Mohd,Zulhumadi Faisal
Reference39 articles.
1. I. Ismael, Keterlambatan Proyek Konstruksi Gedung Faktor Penyebab dan Tindakan Pencegahannya 14(1) 46–56, (2013).
2. M.M. Sharifi, and M. Baghepor, Optimizing Cash-Flow-at-Risk in Construction Projects: A Cost Reduction Approach 60 337–338, (2016).
3. B. Djatmiko, Analisa Kos Proyek Pada Pengembangan Rumah Type 21 dan 36 di Kota Malang 23-29, (2016).
4. T. Noldi, Cash Flow Proyek 28–34, (2016).
5. Jian Lu, and Lu Wei, Research in to the moderating effects of progress and quality performance in project dispute negotiation 32 654–662, (2014).