Author:
Medikondu Nageswara Rao,Ratna Prasad P.,Rajak Upendra,Afzal Asif,Baig Maughal Ahmed Ali,Narendar Ch.
Reference34 articles.
1. Asfahl, C.R. (1992). Robots and manufacturing automation (2nd Ed.). John Wiley & Sons Inc.
2. Advanced manufacturing technologies and strategically flexible production
3. Evaluation of traditional work scheduling rules in a flexible manufacturing system with a physical simulator
4. Chung, C.A. (2004). Simulation modeling handbook: A practical approach. CRC Press.
5. Conway, R.W. (1965a). Priority dispatching and work-in-process inventory in a job shop. Journal of Industrial Engineering, 16(2), 123–130.