1. I. G. Arya, Optimization of reclamation implementation. 2021.
2. Risk analysis of toll road KPS project with SSM (Soft System Methodology) at Gempol – Banyuwangi toll road
3. M. F. SOCRATES, Analysis of Occupational Safety Risk By Hirarc Method (Hazard Identification, Risk Assessment and Risk Control) 2013.
4. P. A. Nursyachbani and N. Susanto, Work Accident Risk Analysis on Jatinengaleh Semarang Underpass Project with Failure Mode and Effect Analysis (FMA) Method, Ind. Eng. Online J., vol. 6, no. 4, p. Hal. 1–7, 2018, [Online]. Available: http://garuda.ristekbrin.go.id/documents/detail/1420769.