Project Management Practices and Implementation of Donor Funded Water and Sanitation Projects in Central Rift Region, Kenya

Author:

Leshinka Patrose Sempeyian,Nyaberi Dr. Dancun

Abstract

The general objective of this study was to establish the influence of project management practices on implementation of donor funded water and sanitation projects in the Central Rift region, Kenya. The study specifically sought to establish the influence of stakeholder involvement, project team training, monitoring and evaluation and risk management on implementation of donor funded water and sanitation projects in the Central Rift region, Kenya. The study was anchored on four theories, namely; stakeholder theory, team theory, dynamic capabilities theory and the theory of resilience. For purposes of this study, a descriptive survey design was employed. The target population were all 160 project members comprising project managers, consultants, project implementation teams and task managers from donor agencies in 16 donor funded water and sanitation projects in the central rift region. Using statistical formulae, a sample of 62 elements was obtained. Purposive sampling was then used in targeting the said staff in each of the donor funded water and sanitation projects. This study used questionnaires in collecting data from the target group. Pilot-test was conducted to check the reliability of the instruments used for data collection. Data was analyzed using both descriptive and inferential statistics with the aid of the Statistical Package for Social Sciences (SPSS) version 25.0. The study revealed that when all the variables for project management practices, stakeholder involvement, project team training, project evaluation and risk management, were multi regressed against the dependent variable, project implementation, there was an observable model of good fit at 99.6% hence, a good predicator of project implementation if cumulatively practiced. The study further found that stakeholder involvement is a significant predicator (p=0.046<.05) of project implementation in donor funded water and sanitation projects in the Central Rift region, Kenya. Further, the study established that project team training is an insignificant positive predicator (p=0.800 >.05) of project implementation. Project evaluation is a significant predictor (p=0.024<.05) of project implementation and role risk management was found to be a significant predictor (p= 0.21 <05) project implementation. Regression analysis revealed that risk management  variable (β = 7.633) has the greatest influence, followed by  stakeholder engagement variable (β = 1.192) then followed by evaluation  variable (β = 0.116) and lastly project team training variable (β = -0.672).Therefore, the study recommended that, project implementation teams for donor funded water and sanitation projects in Kenya should emphasize more on project risk management as it has the most significant influence on project implementation. The study recommends that the donors of the water projects should sustain, project team training, as much it does not significantly influence project implementation, but it contributes significantly to the overall model fit. The findings of this study will be significant to the government since it aims to stimulate economic growth through attaining value for money for funds sourced from donors. The study will also provide opportunities for project managers to identify key project management practices and how they influence implementation of donor funded water and sanitation projects.

Publisher

Research Bridge Publisher

Reference59 articles.

1. . AfDB. (2016). Project Appraisal Report for Kenya Towns Sustainable Water and Sanitation Program. Nairobi: AfDB.

2. . AfDB. (2023). African Development Bank Supervision Mission Report-Quarter one 2023. Nairobi: African Development Bank.

3. . Afzal, A., Khan, M. M., & Mujtaba, B. G. (2018). The impact of project managers' competencies, emotional intelligence and transformational leadership on project success in the information technology sector, (2), 142-154.

4. . Aimee, I., M., & Eugenia, N., I. (2022). Influence of Project Management Practices on Performance of Public Construction Projects in Kamonyi District, Rwanda. Journal of Entrepreneurship & Project Management, 6 (4), 33-49.

5. . Azmach T. & Teklegiorgis A. (2017). Monitoring and Evaluation Practices and challenges Of Local NGOs: Implementing Non-Communicable Disease Projects in Addis Ababa. Unpublished Master Project, University of Addis Ababa.

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Risk Response Planning and Project Implementation Among Faith-Based Construction Projects in The Diocese of Ngong;International Journal of  Innovations and  Interdisciplinary Research (IJIIR) ISSN 3005-4885 (p);3005-4893(o);2024-02-19

2. Effect of Risk Identification on Project Implementation among Faith Based Construction Projects in the Diocese Of Ngong;International Journal of Social Science and Humanities Research (IJSSHR) ISSN 2959-7056 (o); 2959-7048 (p);2024-01-29

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3