Abstract
AIM: PT. Pertamina Gas goes through the process of pig receiving at one of its operations. To support the Occupational Safety and Health (OHS) system, a system is needed to minimize risks. This system is expected to minimize the risks that occur to employees and their environment when carrying out the operation process.
METHODS: Risk analysis was carried out to find information regarding the level of possibility and impact of an event in the operation. In this case, the impact analysis was done on several aspects including people, assets, image, and the environment.
RESULTS: The risk assessment results of the Gresik gas station pig, it was found that low risk of 0%, medium 51%, and high 49% for activity in the gas station.
CONCLUSIONS: The result informs that from risk assessment resulted the Gresik gas station pig level of acceptance has a low risk of 0%, medium 51%, and high 49%. This three level of risk from assessment informs about the potential for occurrence and impacts on the case study. Moreover, from high level of risk need more attention and focus to minimize the risk.
Publisher
Scientific Foundation SPIROSKI