1. [1] Guida P.L., Sacco G. (2019). ”ScheDA: Schedule Delay Analysis”, Computer & Industrial Engineering. Vol. 128, 2/2019, 346-357
2. [2] Sacco G. (2022). Metodo unificato di analisi di Project Control, Tesi in Ingegneria magistrale, Universita di Roma Tre
3. [3] AACE (2011). “Recommended Practice No.29R‑03 for Forensic Schedule Analysis (RP-29R‑03)”, Am. Ass. Cost Engineering
4. [4] SCL (2017). “Delay and Disruption Protocol”, The Society of Construction Law
5. [5] AACE (2017). “RP No. 52R-06, Time Impact Analysis - as Applied in Construction”, AACE International