Author:
Hasani A.,Hosseini S. M. H.
Reference34 articles.
1. [1] A. Hasani, S.M.H. Hosseini, S.S. Sana, (2022). Scheduling in a flexible flow shop with unrelated parallel machines and machine-dependent process stages: Trade-off between Makespan and production costs, Sustain. Anal. Model. 2. 100010.
2. [2] Ebrahim Asadi Gangraj ، Nasim Nahavandi, (2016). Developing a Lagrangian Relaxation Method for Flexible Flowshop Scheduling Problem, J. Ind. Eng. Res. Prod. Syst. 3. 121–131.
3. [3] Q.-K. Pan, Y. Dong, (2014). An improved migrating birds optimisation for a hybrid flowshop scheduling with total flowtime minimisation, Inf. Sci. (Ny). 277. 643–655.
4. [4] X. Wu, Y. Sun, (2018). A green scheduling algorithm for flexible job shop with energy-saving measures, J. Clean. Prod. 172. 3249–3264.
5. [5] C. Shiyi, (2009). Engine or drag: Can high energy consumption and CO2 emission drive the sustainable development of Chinese industry?, Front. Econ. China. 4. 548–571.