Author:
Shin Hyun Kyu,Lee Joo Sung,Jung Chan Woo,Ahn Yong Han
Abstract
ABSTRACT
Modular methods based on the use of prefabricated structures are increasingly popular for construction projects as they contribute to sustainability by reducing waste and maintenance costs as well as improving time efficiency. For short-term international events, the use of relocatable modular buildings is a potential solution to the problem of “White Elephant” structures built specially for the events that serve no useful purpose once the event is over. This paper focuses on a representative relocatable modular project created for the 2018 Winter Olympic Games in South Korea using a single case study approach to develop an in-depth understanding of the advantages and disadvantages of relocatable modular construction from a practitioner’s perspective and examine how this approach supports sustainability and the Olympic legacy. Important considerations are identified for each of the five main stages: 1) planning, 2) design and engineering, 3) manufacturing, 4) construction and 5) disassembly and reconstruction. These findings show how the use of relocatable modular facilities can be a useful approach for international events.
Subject
General Environmental Science,Geography, Planning and Development,Civil and Structural Engineering,Building and Construction,Architecture,Environmental Engineering,Management, Monitoring, Policy and Law,Nature and Landscape Conservation,Public Health, Environmental and Occupational Health
Reference64 articles.
1. Sustainability in modular design and construction: a case study of ‘The Stack’;Ahn,;International Journal of Sustainable Building Technology and Urban Development,2014
2. Life cycle greenhouse gas emissions and energy analysis of prefabricated reusable building modules;Aye,;Energy and Buildings,2012
3. Applying lean thinking in construction and performance improvement;Aziz,;Alexandria Engineering Journal,2013
4. The Economic & Financial Performance of Relocatable Buildings in the U.S. Modular Building Industry;Basu,,2012
5. BC Housing Annual Report 2009/10, Board of Commisioners;BC Housing,2010
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献