1. Park, Y.G., Kim, T.O., Seo, Y.H., An, M.H., Oh, M.J., Yu, S.H., and Hong, Y.S. (2019) Current Status of Temporary Retaining Facilities and Examples of Collapse, Geotechnical Engineering, Korean Geotechnical Society, Vol.35, No.4, pp.50-67 (in Korean).
2. Korea Infrastructure Safety and Technology Corporation (2007) Technical Review Cases II: Retaining Wall and Excavation, Korea (in Korean).
3. Ministry of Land, Infrastructure and Transport (2022) Design Standard for Temporary Retaining Wall (KDS 21 30 00: 2022), Korea (in Korean).
4. Ministry of Land, Infrastructure and Transport (2022) Standard Specifications for Temporary Work of Retaining Wall (KCS 21 30 00: 2022), Korea (in Korean).
5. Lee, K.-N. (2018) The Parameter Analysis for Optimal Design of H-Pile/Plastic Sheet Pile Method, Ph.D Dissertation, Chungnam National University, Korea (in Korean).