Analysis of Road Construction Projects Price Changes in the Selected Phases of their Life-Cycle

Author:

Korytarova JanaORCID,Hanak TomasORCID

Abstract

This paper deals with an analysis of causes that lead to the change in price (value of construction costs) of road infrastructure projects in selected phases of the building structure life-cycle, more specifically procurement and construction phases, with the aim to refine the price estimation in the Estimated Value determination phase. The sample of regional road construction projects in the South Moravian Region (Czech Republic) documentation forms the basis for the research. The methodological procedure is aimed at monitoring changes in the value of construction costs during the preparation and implementation phase of the construction. Estimated values, contract prices and actual prices of individual projects are compared to determine them and the reasons for their differences are discussed. The changes (decrease) in the values of construction costs determined by estimated value and contract price show the strong influence of the construction market and the interest of construction companies in the implementation of public works contracts in the field of road infrastructure projects. The relative differences range up to 47%. The changes (increase) in construction costs determined by contract price and actual price are much lower, up to 13%, and result from specific situations during the implementation of the construction, for which subsoil bearing capacity problems and material changes were determined as the most significant.

Publisher

Warsaw University of Life Sciences - SGGW Press

Subject

Earth-Surface Processes,General Environmental Science,Geotechnical Engineering and Engineering Geology,Building and Construction,Civil and Structural Engineering

Reference19 articles.

1. Adel, K. et al. (2016) ‘Developing Parametric Model for Conceptual Cost Estimate of Highway Projects’, International Journal of Engineering Science and Computing, 6(7), pp. 1728–1734. Available at: http://ijesc.org/.

2. Bhaskaran, R., Palaniswamy, N. & Rengaswamy, N. S. (2006) ‘Life-cycle cost analysis of a concrete road bridge across open sea’, Materials Performance, 45(10), pp. 51–55.

3. Cantarelli, C. C. et al. (2010) ‘Cost overruns in large-scale transportation infrastructure projects: Explanations and their theoretical embeddedness’, European Journal of Transport and Infrastructure Research, 10(1), pp. 5–18. https://doi.org/10.18757/ejtir.2010.10.1.2864

4. An international experience on the evolution of road costs during the project life cycle

5. Impact of Competition on Prices in Public Sector Procurement

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3