Abstract
Based on catalogues, the time schedule of erecting multi-storey building has been prepared. Real current conditions and the average cost of the building allows for creating the model where four variables influence NPV and maximum cash demand of a contractor erecting the building. The simulation made in the spreadsheet is the base for calculating and presenting the sensitivity analysis of each variable separately, as well as, for creating the surface chart where the joint influence of terms of payments affects the maximum demand for cash. The way of using of this chart has been described aiming at the protection of the contractor from losing financial liquidity while the profi table project is executed.
Publisher
Warsaw University of Life Sciences – SGGW Press
Subject
Earth-Surface Processes,General Environmental Science,Geotechnical Engineering and Engineering Geology,Building and Construction,Civil and Structural Engineering
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献