1. [1] A. Kumar and S. C. Malik, �Reliability Analysis
of a Redundant System with �FCFS� Repair Policy Subject to Weather
Conditions�, International Journal of Advanced Science and Technology
,Vol. 29, No. 03, 2020, pp. 7568 � 7578.
2. [3] Chib, Rakesh, J.P. S. Joorel, and V. Sharma
�Profit Analysis of a Two Unit Priority System with Two Types of Repair
Facility�, International Journal of Statistics and Reliability
Engineering, Vol. 1, No. 1, 2014, pp. 69-81.
3. [4] I. kumar, A. Kumar, and M. Saina, �Analysis of
performance measures of computer systems with priority and maximum
operation time,� Advances in intelligent systems and computing,Springer
Singapore, vol 933, 2019.
4. [5] J.K. Sureria and S.C. Malik �Reliability
Measures of a Computer System with Arrival Time of the Server and
Priority to H/w Repair over S/w Up-gradation�, International Journal of
Computer Applications, Vol. 65, No.13, 2013, pp.
44-48.