Non-Identical Parallel Machine Scheduling Problem with Sequence-Dependent Setup Time: An Application in a Corrugated Cardboard Factory
Author:
Affiliation:
1. Kırıkkale Üniversitesi, Mühendislik Fakültesi, Endüstri Mühendisliği A.B.D
2. KIRIKKALE ÜNİVERSİTESİ, MÜHENDİSLİK FAKÜLTESİ, ENDÜSTRİ MÜHENDİSLİĞİ BÖLÜMÜ
Abstract
Publisher
Uluslararasi Muhendislik Arastirma ve Gelistirme Dergisi
Subject
General Medicine
Reference20 articles.
1. Arnaout, J. P., Rabadi, G., & Musa, R. (2010). A Two-Stage Ant Colony Optimization Algorithm To Minimize The Makespan On Unrelated Parallel Machines With Sequence-Dependent Setup Times. Journal Of Intelligent Manufacturing, 21(6), 693-701.
2. Bank, J., & Werner, F. (2001). Heuristic Algorithms For Unrelated Parallel Machine Scheduling With A Common Due Date, Release Dates, And Linear Earliness And Tardiness Penalties. Mathematical And Computer Modelling, 33(4-5), 363-383.
3. Chen, J. F. (2009). Scheduling On Unrelated Parallel Machines With Sequence-And Machine-Dependent Setup Times And Due-Date Constraints. The International Journal Of Advanced Manufacturing Technology, 44(11), 1204-1212.
4. French, S. (1982). Sequencing And Scheduling: An Introduction To The Mathematics Of The Job-Shop. New York: Ellis Horwood Series.
5. Furugi, A. (2021). Makine Uygunluk Kısıtlaması Ve Sıra Bağımlı Kurulum Süresi İle Özdeş Olmayan Paralel Makine Çizelgeleme Problemi İçin Tabu Arama Algoritması. Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi, 36(3), 1539-1550.
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3