Affiliation:
1. Department of Mechanical Engineering, Osaka University, 2-1 Yamadaoka, Suita, Osaka 565-0871, Japan
Abstract
In areas inaccessible to humans, such as the lunar surface and landslide sites, there is a need for multiple autonomous mobile robot systems that can replace human workers. Robots are required to remove water and sediment from landslide sites such as river channel blockages as soon as possible. Conventionally, several construction machines are deployed at civil engineering sites. However, owing to the large size and weight of conventional construction equipment, it is difficult to move multiple units of construction equipment to a site, which results in significant transportation costs and time. To solve such problems, this study proposes GREEMA: growing robot by eating environmental material, which is lightweight and compact during transportation and functions by eating environmental materials once it arrives at the site. GREEMA actively takes in environmental materials, such as water and sediment, uses them as its structure, and removes them by moving itself. In this study, two types of GREEMAs were developed and experimentally verified. First, we developed a fin-type swimming robot that passively takes in water into its body using a water-absorbing polymer and forms a body to express its swimming function. Second, we constructed an arm-type robot that eats soil to increase the rigidity of its body. We discuss the results of these two experiments from the viewpoint of explicit-implicit control and describe the design theory of GREEMA.
Funder
Japan Society for the Promotion of Science
Japan Science and Technology Agency
Publisher
Fuji Technology Press Ltd.
Reference31 articles.
1. F. Akazawa et al., “Numerical simulation of landslide dam deformation by overtopping flow,” Int. J. of Erosion Control Engineering, Vol.7, No.3, pp. 85-91, 2014. https://doi.org/10.13101/ijece.7.85
2. H. Zheng et al., “Recent advances in stability and failure mechanisms of landslide dams,” Frontiers in Earth Science, Vol.9, Article No.659935, 2021. https://doi.org/10.3389/feart.2021.659935
3. X. Fan et al., “Recent technological and methodological advances for the investigation of landslide dams,” Earth-Science Reviews, Vol.218, Article No.103646, 2021. https://doi.org/10.1016/j.earscirev.2021.103646
4. W. Sakurai, “The way of urgent works against large landslide dam,” J. of the Japan Society of Erosion Control Engineering, Vol.71, No.6, pp. 14-20, 2019 (in Japanese). https://doi.org/10.11475/sabo.71.6_14
5. H. Sugawara, “Efforts of countermeasures for land slide dam in Kii Mountain District Sabo Office,” J. of the Japan Society of Erosion Control Engineering, Vol.72, No.1, pp. 45-50, 2019 (in Japanese). https://doi.org/10.11475/sabo.72.1_45