A Fuzzy CDS-based Scheduling Algorithm for More Than Two Machine Centers
-
Published:2001-07-20
Issue:4
Volume:5
Page:239-245
-
ISSN:1883-8014
-
Container-title:Journal of Advanced Computational Intelligence and Intelligent Informatics
-
language:en
-
Short-container-title:JACIII
Author:
Hong Tzung-Pei, ,Wang Tzu-Ting,Wang Shyue-Liang,
Abstract
In simple flow shop problems, each machine operation center includes just one machine. If at least one machine center includes more than one machine, the scheduling problem becomes a flexible flow-shop problem. Flexible flow shops can thus be thought of as generalizations of simple flow shops. In Ref.14), we have demonstrated how fuzzy concepts can easily be used in the Sriskandarajak and Sethi’s algorithm for managing uncertain scheduling on two-machine centers. This paper extends application to fuzzy flexible flow-shops with more than two machine centers. A new fuzzy heuristic flexible flowshop scheduling algorithm is then designed since optimal solutions seem unnecessary for uncertain environments. We first use fuzzy LPT algorithm to allocate jobs into the groups and then use the fuzzy CDS algorithm to deal with sequencing the tasks. The proposed method thus provides a flexible way to more fit real world applications.
Publisher
Fuji Technology Press Ltd.
Subject
Artificial Intelligence,Computer Vision and Pattern Recognition,Human-Computer Interaction
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献