Author:
Lee Jonathan, ,Deng Whan-Yo,Lee Wen-Tin,Lee Shin-Jie,Hsu Kuo-Hsun,Ma Shang-Pin, ,
Abstract
In software development, project plans document scope, cost, effort, and schedule, guide project managers, and control project execution. Developing a project plan without incorporating how an organization doing things - i.e., organizational culture - may lead to project failure. To ensure stable process performance and to benefit from organizational culture, it is crucial that organizational processes be taken into account in project planning. Organizational processes enable stable process performance across an organization and provide a basis for cumulative, long term benefits to the organization. In proposing a systematic approach that supports bi-directional transformation between processes and the Work Breakdown Structure (WBS), we propose Process2WBS and WBS2Process to assist project managers in project planning with an organization’s set of standard processes. Process2WBS consumes processes and transforms them into a WBS with Design Structure Matrix (DSM) analysis, and WBS2Process transforms the WBS with project-specific information into executable processes expressed in XPDL.
Publisher
Fuji Technology Press Ltd.
Subject
Artificial Intelligence,Computer Vision and Pattern Recognition,Human-Computer Interaction
Reference40 articles.
1. “Work Breakdown Structure “WBS”,” http://www.hyperthot.com/pm_wbs.htm/
2. Booz, Allen, and Hamilton, “Earned Value Management Tutorial Module 2, Work Breakdown Structure,” Office of Project Assessment, 2008.
3. NASA 2001, “NASA NPR 9501.2D.,” May 23, 2001.
4. R. A. Radice, N. K. Roth, A. C. O’Hara, Jr., and W. A. Ciarfella, “A Programming Process Architecture,” j-IBM-SYS-J, Vol.24, No.2, pp. 79-90, 1985.
5. D. V. Steward, “The Design Structure System, A Method for Managing the Design of Complex Systems,” IEEE Trans. on Engineering Management, Vol.28, pp. 71-74, 1981.
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献