Abstract
With the rapid development of urbanization, the number of super high-rise buildings with increased building volume and scale is gradually increasing. At present, there are still problems such as inconsistent engineering information transmission and low efficiency of collaborative management among various participants in the construction of international super high-rise buildings. Because of this, based on engineering practice, using the advantages of BIM technology such as visualization, simulation, and collaboration, this article explores the application process of BIM technology in the design stage of super high-rise buildings, such as multi-disciplinary detailed design and drawing collision inspection, as well as in the construction stage, such as visual technical disclosure and scheme selection. It also constructs a BIM whole process management system, enabling BIM technology to better participate in the whole process of project construction, improving the level of project information technology, and providing engineering reference for the application of BIM technology in similar super high-rise buildings.
Publisher
Darcy & Roy Press Co. Ltd.
Reference12 articles.
1. Hashemi, A. Special issue on Building Information Modelling (BIM and housing development). Int. J. 3-D Inf. Model. 2014,3, iv–v.
2. Eastman, C.; TeicholzP.; Sacks, R.; Lee, G. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors; John Wiley & Sons: Hoboken, NJ, USA, 2011.
3. Gao, J.; Fischer, M. Framework and Case Studies Comparing Implementations and Impacts of 3D/4D Modeling Across Projects; CIFE: Stanford, CA, USA, 2008.
4. Hartmann, T.; Gao, J.; Fischer, M. Areas of application for 3D and 4D models on construction Projects. J. Constr. Eng. Manag. 2008, 134, 776–785.CrossRef]
5. Chin, S.; Yoon, S.; Choi, C.; Cho, C. RFID+4D CAD for progress management of structural steel works in high-rise buildings. J.Computing. Civ. Eng. 2008, 22, 74–89.CrossRef]