Construction Processes and Strategies of Millau Viaduct

Author:

Lin Xiangchen

Abstract

Millau Viaduct crosses the Tarn Gorge and is one of the highest bridges in the world. More than 20 years after its completion, it still holds the record for the highest pier in the world. It is a shining pearl in the history of human architecture. In this study, the construction processes and strategies of Millau Viaduct are introduced in detail. Results show that after the concrete pier was poured, the bridge deck was pushed forward by applying the jacking from the tail then completed the construction of the long-span bridge. In order to reduce the impact of wind during construction, the construction team improved the construction accuracy by optimizing the bridge model and using satellite positioning. Combined with understanding and perception of the high span and high-risk construction projects such as Millau Viaduct, some methods are put forward to improve the construction technology. These construction methods could be adopted in the future to reduce the risks associated with the project.

Publisher

Darcy & Roy Press Co. Ltd.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3