1. Callahan, M. T., Quackenbush, D. G., & Rowings, J. E. (1992). Construction project scheduling. New York: McGraw-Hill.
2. Cho, C. H., Lee, Y. J., Kang, D. E., Kim, T. J., Kim, J. H., & Lee, H. R. (2012). Basic studies for effective development of optimal integrated process of complex-shaped tall building structural systems. Journal of the Architectural Institute of Korea (Structure & Construction), 28(10), 55–64.
3. Elinwa, A. U., & Joshua, M. (2001). Time-overrun factors in Nigerian construction industry, ASCE. Journal of Construction Engineering and Management, 127(5), 419–425.
4. Hong, Y. T., Yu, J. H., Lim, K. H., & Lee, H. S. (2004). Evaluation of time-affecting factors in high-rise building construction using FMEA. Journal of the Architectural Institute of Korea (Structure & Construction), 20(10), 183–192.
5. Joo, H. J., Kim, K. H., Kim, H. S., & Kim, J. J. (2008). A study on the analysis of problems in the architectural design competition by means of the analysis method FMEA. Journal of the Architectural Institute of Korea (Structure & Construction), 24(11), 101–108.