Abstract
AbstractBridges are an essential part of every road and transportation system, and all countries must build bridges to improve their infrastructure. Accelerated bridge construction (ABC) is an innovative approach that has been noticed in recent years to facilitate and accelerate the process of building, repairing, or replacing bridges. This paper underscores the significance of ABC in bridge construction, focusing on its potential to offer speed, safety, and enhanced longevity for bridge pier. Through a comprehensive exploration of prefabricated elements and systems specific to bridge piers, insights into their applicability, advantages, and limitations are presented. A special section is dedicated to the investigation of pier connections under seismic loads. Furthermore, the review contrasts ABC with traditional construction methodologies, highlighting areas of excellence and potential improvement for ABC.
Publisher
Springer Science and Business Media LLC
Reference48 articles.
1. AASHTO (2007) AASHTO LRFD Bridge Design Specificaitons: customary US units 4th Edition-2007. American association of state highway and transportation officials
2. Ameli MJ, Parks JE, Brown DN, Pantelides CP (2015) Seismic evaluation of grouted splice sleeve connections for reinforced precast concrete column–to–cap beam joints in accelerated bridge construction. pcij 60(2):80–103. https://doi.org/10.15554/pcij.03012015.80.103
3. Belleri A, Riva P (2012) Seismic performance and retrofit of precast concrete grouted sleeve connections. PCI J 57(1)
4. Caltrans (2021) Accelerated bridge construction manual.
5. Culmo MP (2009) Connection details for prefabricated bridge elements and systems. United States. Report No. FHWA-IF-09-010. Federal Highway Administration. Office of Bridge Technology. https://rosap.ntl.bts.gov/view/dot/23680
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献