Author:
Ge Yulong,Wang Qing,Wang Yong,Lyu Daqian,Cao Xinyun,Shen Fei,Meng Xiaolin
Abstract
AbstractA new Precise Point Positioning (PPP) service, called the PPP-B2b service, has been implemented in the BeiDou-3 Navigation Satellite System (BDS-3), which brings new opportunities for time transfer. However, the solution using the traditional PPP method with the PPP-B2b correction still absorbs some unknown errors and needs reconverging when there exist abnormal data. We developed a new receiver clock model to improve PPP time transfer using the PPP-B2b correction. The traditional PPP time transfers using PPP-B2b with BDS-3, Global Positioning System (GPS), and BDS-3/GPS (Scheme1) are compared with the corresponding time transfer with the proposed clock model (Scheme2). The results show that GPS-only PPP is not recommended because of low accuracy of 2 ns. BDS-3 or BDS-3/GPS PPP time transfers in Scheme1 can realize about 0.2 ns accuracy. When the new clock model is applied, the accuracy can be improved by up to 45% and 39.8% for BDS-3 and BDS-3/GPS PPP, respectively. The proposed clock model can significantly improve the short-term frequency stability by 57.4%, but less for the long-term stability.
Funder
National Natural Science Foundation of China
Publisher
Springer Science and Business Media LLC
Reference37 articles.
1. Chen, X., Lu, C., Guo, B., Guo, F., Ge, M., Li, X., & Schuh, H. (2018). GPS/GLONASS combined precise point positioning with the modeling of highly stable receiver clock in the application of monitoring active seismic deformation. Journal of Geophysical Research: Solid Earth, 123(5), 4025–4040. https://doi.org/10.1029/2017jb015060
2. CSNO (2020a) BeiDou navigation satellite system signal in space interface control document open service signal B2b (Version 1.0).
3. CSNO (2020b) BeiDou navigation satellite system signal in space interface control document precise point positioning service signal PPP-B2b (Version 1.0).
4. Defraigne, P., Carine, B., and Nicolas, G. (2007) PPP and phase-only GPS time and frequency transfer. In: Proceedings of the IEEE international frequency control symposium jointly with the 21st European frequency and time forum (EFTF ’07), pp. 904–908.
5. Defraigne, P., & Petit, G. (2003). Time transfer to TAI using geodetic receivers. Metrologia, 40(4), 184–188. https://doi.org/10.1088/0026-1394/40/4/307
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献