Abstract
Abstract
Background
Training health extension workers on Implanon insertion offsite, or away from the workplace, can be cost-intensive, can depend on the human and financial resources of partners, and can compromise routine health services by taking health workers off the job. To address these limitations, the USAID Transform Primary Health Care Activity in Ethiopia designed an onsite Implanon insertion training at the primary health care level. This study compared and documented the implementation experience of onsite vs offsite Implanon insertion training for health extension workers.
Methods
In a mixed-method study conducted in March 2020, the team collected training data from 468 participants—half trained onsite and half offsite—and conducted key informant interviews with 20 purposively sampled individuals. The team analyzed this data, summarizing the data in tables and figures and performing a t test with p value < 0.05 using SPSS v.20. Qualitative data were analyzed manually in Excel and summarized in Word based on emerging themes.
Results
Health extension workers trained onsite were away from routine work an average of 3 days compared to 8 days for those trained offsite (P < 0.001). The difference in average per-trainee cost of onsite (2707 Birr = 87.3 USD) and offsite (6006 Birr = 193.7USD) training was significant (P < 0.001). There was no significant difference in mean scores of onsite and offsite trainees on the knowledge pre-test (P < 0.947) and post-test (P < 0.220) or in simulated practice on an arm model (p < 0.202). Onsite trainees, assigned to their own health post for clinical practice, performed Implanon insertions on an average of 10 clients: offsite trainees on an average of 5 clients. Most interview participants reported that the onsite Implanon training was better organized, conducted, followed up, and monitored by health centers to ensure community-level access to Implanon services, with quality and continuity.
Conclusions
Onsite training is a promising approach and minimizes service interruption. It is a likely strategy for on-demand training of health extension workers and immediate assignment of skilled providers to ensure access to and continuity of quality community-level Implanon care.
Trial registration N/A.
Publisher
Springer Science and Business Media LLC
Subject
Public Health, Environmental and Occupational Health,Public Administration
Reference19 articles.
1. Ahmed S, Li Q, Liu L, Tsui AO. Maternal deaths averted by contraceptive use: an analysis of 172 countries. Lancet. 2012;380(9837):111–25.
2. FP2020 2015 Report to the Independent Expert Review Group. Washington, DC, USA: FP2020 Secretariat; 2015. Available from: www.familyplaning2020.org.
3. Training strategy: scaling up availability and access to Implanon service through service provision by health extension level. Addis Ababa, Ethiopia: Federal Ministry of Health of Ethiopia; 2009.
4. Implanon insertion training evaluation report. Addis Ababa, Ethiopia: Federal Ministry of Health of Ethiopia; 2012.
5. Asnake M, Henry EG, Tilahun Y, Oliveras E. Addressing unmet need for long-acting family planning in Ethiopia: uptake of single-rod progestogen contraceptive implants (Implanon) and characteristics of users. Int J Gynecol Obstet. 2013;123:e29-32.