Abstract
Abstract
Integrity issues create challenges for maintaining the production of mature geothermal wells. Such problems are likely to occur in wells designed according to oil and gas standards, without considering the extreme geothermal environment. PT Geo Dipa Energi as the operator of the Dieng geothermal field, one of the longest operated in Indonesia, has experienced this difficulty since acquiring the field. Almost half of the production wells have been abandoned because of casing issues. To increase production, the operator plans to reactivate wells that have been previously abandoned. An initial study was performed to assess the technical feasibility of reactivating wells at Dieng; it included the development of a well assessment methodology including casing design, comprising historical data analysis, identification of well problems, and investigation of well integrity. The study focused on the identification and characterization of two abandoned wells, HCE9B and HCE28B, current casing conditions, limitations, and challenges to perform a well intervention and workover which is realistic, measurable, economic, and technically feasible. The result of this study will be applicable for casing design for future wells.
Publisher
Springer Science and Business Media LLC
Subject
Economic Geology,Geotechnical Engineering and Engineering Geology,Renewable Energy, Sustainability and the Environment
Reference30 articles.
1. Agustinus ETS, Syafri I, Rosana MF, Zulkarnain I. Scale prevention technique to minimized scaling on re-injection pipes in Dieng geothermal field, Central Java Province, Indonesia. Indonesian J Geosci. 2018;5:129–36.
2. Asian Development Bank and The World Bank. Unlocking Indonesia’s geothermal potential. Philippines, 85. 2015.
https://www.adb.org/sites/default/files/publication/157824/unlocking-indonesias-geothermal-potential.pdf
. Accessed June 2019.
3. Capuano LE Jr. Geothermal well drilling. Chap. 5. In: DiPippo R, editor. Geothermal power generation-developments and innovation. Amsterdam: Elsevier; 2016. p. 107–39.
https://doi.org/10.1016/C2014-0-03384-9
.
4. Caulk RA, Tomac I. Reuse of abandoned oil and gas wells for geothermal energy production. Renew Energy. 2017;112:388–97.
https://doi.org/10.1016/j.renene.2017.05.042
.
5. Darma S. Indonesia: vast geothermal potential, modest but growing exploitation. Chap. 21. In: DiPippo R, editor. Geothermal power generation-developments and innovation. Amsterdam: Elsevier; 2016. p. 609–43.
https://doi.org/10.1016/C2014-0-03384-9
.
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献