Importance of grouting for tunneling in karstic and complex environment (a case study from Türkiye)

Author:

Tacim Gokhan,Posluk Evren,Gokceoglu CandanORCID

Abstract

AbstractIn the planning of the tunnel support system, besides the detailed investigation of the geological-geotechnical conditions, it is also important to investigate the structure-tunnel interaction. Especially the structures located in the close vicinity of the tunnels built in unpredictable geological conditions should be considered as a part of the tunnel support system design and the planning should be performed. However, the strong heterogeneity and anisotropy characteristics of karstic environments affect the planning. In this study, a single-track railway tunnel excavated in a relatively thin-bedded, karstic limestone in the Gebze Köseköy Railway project is investigated in terms of structure-tunnel interaction and the importance of grouting. The fact that the tunnel, located in the center of the two piers of the Osmangazi Suspension Bridge approach viaducts, built on the Gulf of Izmit, passes through a shallow overburden, is also an important difficulty in the design of the tunnel. Some karstic caves are determined in the limestones besides its heavily fractured nature. It is concluded that there is a possibility of damage to the bridge as a result of different settlements under the viaduct piers during the tunnel construction with the support to be performed only through the tunnel, and the karstic caves should be filled in order to prevent possible damages. The karstic limestones along the tunnel route are strengthened from the surface by injection of a mixture of water, cement, bentonite, and sand. The interaction of the tunnel with the viaduct after injection is investigated with 2D and 3D numerical analysis and tunnel excavation and support works are started. With the tunnel construction, measurements taken from inside the tunnel and from the viaduct piers, values very close to the predicted deformation limits were obtained by 3D numerical analysis, and the tunnel construction is successfully completed. Despite the extremely difficult conditions, the main reason why no problems are encountered during the tunnel construction is considered to be the grouting.

Publisher

Springer Science and Business Media LLC

Subject

Energy (miscellaneous),Mechanics of Materials,Geotechnical Engineering and Engineering Geology

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Sinkhole stability chart for geotechnical investigation;Transportation Geotechnics;2024-03

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3