1. Abul-Atta , A-A. Egypt and the Nile After the construction of the High Dam, report Cairo 1978
2. Alarcon , L. D. Marks A stochastic dynamic programming model for the operation of the High Aswan Dam Cambridge, Mass. 1979
3. Buchanan , R. B. R. L. Bras Study of a real-time adaptive closed loop control algorithm for reservoir operation Cambridge, Mass. 1981
4. Curry , K. R. L. Bras Multivariate seasonal time series forecast with application to adaptive control Cambridge, Mass. 1980