1. Beauheim , R. L. Hydraulic-test interpretations for well DOE-2 at the Waste Isolation Pilot Plant (WIPP) site Albuquerque, N. M. 1986
2. Beauheim , R. L. Analysis of pumping tests of the Culebra dolomite conducted at the H-3 hydropad at the Waste Isolation Pilot Plant (WIPP) site Albuquerque, N. M. 1987
3. Beauheim , R. L. Interpretation of the WIPP-13 multipad pumping test of the Culebra dolomite at the Waste Isolation Pilot Plant (WIPP) site Albuquerque, N. M. 1987
4. Beauheim , R. L. Interpretations of single-well hydraulic tests conducted at and near the Waste Isolation Pilot Plant (WIPP) site, 1983-1987 Albuquerque, N. M. 1987
5. Beauheim , R. L. Scale effects in well testing in fractured media 1988