Hollow-core precast and two-way solid slabs: Cost estimation and time duration comparison
-
Published:2021-01-31
Issue:1
Volume:2
Page:29-35
-
ISSN:2703-7266
-
Container-title:International Journal of Advanced Engineering, Sciences and Applications
-
language:
-
Short-container-title:IJAESA
Author:
Sarhan Osamah,Raslan Mahdy,Tallawi Gazi
Abstract
Time and cost are important factors affecting the successful completion of the construction building project. This study analyses and examines the cost and time comparison of precast and cast-in-situ slabs of a particular building. Taking into account that slab is one of the important structural members, this study will take the hollow core slab in particular which can define as precast prestressed concrete elements contain an empty void inside of it which mostly used for floor, roof slabs and wall panels. The results demonstrate that the precast slab construction time is extremely faster in comparison with the cast-in-situ slab as it took around 31 of working days and 43 days in total after considering the holidays while the precast slab took around 9 working days only and 13 days in total. The results also show that the cast-in-situ slab is inferior in both cost and time duration. As cast-in-situ cost is 3.76 times higher than the precast slab, and the time duration is 3.31 times longer.
Publisher
London Tech Press
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献