ON THE LIMITATIONS OF THE EARNED VALUE MANAGEMENT TECHNIQUE TO ANTICIPATE PROJECT DELAYS

Author:

Ballesteros-Pérez Pablo,Elamrousy Kamel Mohamed

Abstract

A significant proportion of projects across the construction industry fail to meet their planned completion dates, being this a recurrent topic in the project management literature. Multiples causes of project delays have been proposed, however, hardly any attention has been paid to the fact that the most celebrated project monitoring and control technique – the Earned Value Management (EVM) – may not be as fit for purpose as it seems. It is proposed that because EVM ignores activity duration variability it always results in optimistic completion dates which may be very difficult to meet in the real projects. This research offers a fresh and long overdue critique of EVM in its most common implementation (assuming deterministic activity durations and costs), while highlighting its shortcomings. Particularly, Monte Carlo simulations are implemented to exemplify how the merge event bias phenomenon is inadvertently impacting the schedule in both time and cost dimensions. A fictitious case study is used to demonstrate the connection between these shortcomings and what is then conceived as a delay in project completion.

Publisher

ISEC Press

Subject

Organic Chemistry,Biochemistry

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Course of planned, actual and earned cost curves of diverse construction investments;International Journal of Construction Management;2021-06-26

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3