Use of the Chief Engineers Experience to Prioritize Operational Tasks in the Ship Engine Room

Author:

Kaminski Piotr1

Affiliation:

1. Gdynia Maritime University , Poland

Abstract

Abstract The frequent causes of ships’ detentions by port authorities are abnormalities of marine power plant functioning. Each extended ship lay time in port results in a waste of ship operating time thus costs rise to ship owners. This is connected with improper marine power plant management. In order to avoid this, a ship engineer should have at his disposal computer aided system supporting him in the managing of the marine power plant. One element of the decision making process in managing the marine engine room is to determine how important is each of the tasks which the operators have to do. This estimation is the base to choose the most important tasks and make optimal schedule with them using AHP method. Based on practice, a hierarchic structure of factors influencing a tasks validity in the engine room operating process was made. Next a preliminary questionnaire was conducted, which put questions to the experts as chief engineers next. This enabled to define numerical values of suitable coefficients influencing on the validity of operating tasks, show results of calculations in form of mileage parameters of engine as a function of crank angle.

Publisher

Walter de Gruyter GmbH

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3