Author:
Dylewski Robert,Jardzioch Andrzej
Abstract
Abstract
The article addresses the problem of determining the sequence of entering orders for production in a flexible manufacturing system implementing technological operations of cutting sheet metal. Adopting a specific ranking of production orders gives rise to the vector of delays and waste in the form of incompletely used sheets. A new method was postulated for determining the optimal sequence of orders in terms of two criteria: the total cost of delays and the amount of production waste. The examples illustrate the advantages of the proposed method compared with the popular heuristic principles.
Subject
Management of Technology and Innovation,Industrial and Manufacturing Engineering,Organizational Behavior and Human Resource Management,Management Science and Operations Research,Business and International Management
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献