1. ADB [Asian Development Bank], 2010. Padma Multipurpose Bridge Project: Environmental Assessment Report. Project Number: 35049. Asian Development Bank. Dhaka, Bangladesh. Online: www.adb.org/sites/default/files/project-document/63200/35049-01-ban-eia.pdf (accessed 20 July 2017).
2. Ahmed N., 1989. Study of some bank protective works in Bangladesh. Department of water resource engineering, BUET, Dhaka.
3. Alam M.S., Hoque N., 1998. Channel pattern and sedimentation style in the Meghna river, Bangladesh: An example of a large-scale anastomosing fluvial system. Journal of remote sensing and environment 2.
4. Azuma R., Sekiguchi H., Ono T., 2007. Studies of High-resolution Morphodynamics with Special Reference to River Bank Erosion vol. 50(C). Annuals of Disaster Prevention Research Institute. Kyoto University, Japan.
5. BWDB [Bangladesh Water Development Board], 2013. Water discharge data. Bangladesh Water Development Board. Govt. of Bangladesh, Dhaka.