1. Improved accuracy in modelling armoured breakwaters with SPH;Altomare;7th International SPHERIC Workshop, Prato, Italy, 29–31 May 2012,2012
2. Geohydraulic investigations of rubble mound breakwaters;Burger;Proceedings 21st I.C.C.E, Malaga,1988
3. Hydraulic responses - wave run-up, rundown and overtopping;Burcharth;OPTICREST, Start-up Workshop, Ghent, March 1988,1998
4. Stability of armour units in oscillatory flow;Burcharth;Coastal Structures, Washington, U.S.A., 9–11 March 1983,1983
5. Rubble mound breakwater overtopping estimation of the reliability of a 3D numerical simulation;Cavallaro;33rd International Conference on Coastal Engineering, Santander, Spain, 1–6 July 2012,2012