Statistical Process Control as a Failure Removal Improvement Tool

Author:

Zasadzień Michał1,Midor Katarzyna1

Affiliation:

1. Silesian University of Technology, Gliwice , Poland

Abstract

Abstract Continuous improvement should be a part of the strategy of every modern company that wishes to meet the requirements posed by the demanding, competitive market. The article presents a concept of applying a tool known from quality engineering, i.e. Shewhart control charts, for the improvement of the maintenance process in a small company providing services for the agricultural and construction industries. The improvement of the process included the reducing of the downtime of belt conveyors due to failures. Using control charts allowed the detection of interferences in the process and defining of their nature. Using other tools such as 5 WHY allowed the identification of the root causes of overly long downtimes and, consequently, formulation and implementation of improvements and preventive measures that were optimal for the organisation. The verification of actions taken has shown their positive impact on the process, which was reflected in the shortening of downtime and, subsequently, streamlining the failure removal process. The paper presents a possibility and validity of utilising quality engineering tools, such as Shewhart’s charts, 5 WHY or Ishikawa diagram, for improving the maintenance processes.

Publisher

Walter de Gruyter GmbH

Subject

Mechanical Engineering,Waste Management and Disposal,Agronomy and Crop Science

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3