Method for Location of An External Dump in Surface Mining Using the A-Star Algorithm

Author:

Zajączkowski Maciej,Kasztelewicz Zbigniew,Sikora Mateusz

Abstract

Abstract The construction of a surface mine always involves the necessity of accessing deposits through the removal of the residual overburden above. In the beginning phase of exploitation, the masses of overburden are located outside the perimeters of the excavation site, on the external dump, until the moment of internal dumping. In the case of lignite surface mines, these dumps can cover a ground surface of several dozen to a few thousand hectares. This results from a high concentration of lignite extraction, counted in millions of Mg per year, and the relatively large depth of its residual deposits. Determining the best place for the location of an external dump requires a detailed analysis of existing options, followed by a choice of the most favorable one. This article, using the case study of an open-cast lignite mine, presents the selection method for an external dump location based on graph theory and the A-star algorithm. This algorithm, based on the spatial distribution of individual intersections on the graph, seeks specified graph states, continually expanding them with additional elementary fields until the required surface area for the external dump - defined by the lowest value of the occupied site - is achieved. To do this, it is necessary to accurately identify the factors affecting the choice of dump location. On such a basis, it is then possible to specify the target function, which reflects the individual costs of dump construction on a given site. This is discussed further in chapter 3. The area of potential dump location has been divided into elementary fields, each represented by a corresponding geometrical locus. Ascribed to this locus, in addition to its geodesic coordinates, are the appropriate attributes reflecting the degree of development of its elementary field. These tasks can be carried out automatically thanks to the integration of the method with the system of geospatial data management for the given area. The collection of loci, together with geodesic coordinates, constitutes the points on the graph used during exploration. This is done using the A-star algorithm, which uses a heuristic function, allowing it to identify the optimal solution; therefore, the collection of elementary fields, which occupy the potential construction area of a dump, characterized by the lowest value representing the cost of occupation and dumping of overburden in the area. The precision of the boundary, generated by the algorithm, is dependent on the established size of the elementary field, and should be refined each time by the designer of the surface mine. This article presents the application of the above method of dump location using the example of “Tomisławice,” a lignite surface mine owned by PAK KWB Konin S. A. The method made it possible to identify the most favorable dump location on the northeast side of the initial pit, within 2 kilometers of its surrounding area (discussed further in chapter 3). This method is universal in nature and, after certain modifications, can be implemented for other surface mines as well.

Publisher

Walter de Gruyter GmbH

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3