Contract price change during the construction phase: unforeseen market conditions

Author:

Suman Natasa1,Tominc Stanko2

Affiliation:

1. University of Maribor, Faculty of Civil Engineering, Transportation Engineering and Architecture , Maribor , Slovenia

2. Javno podjetje Nigrad, d. o. o ., Maribor , Slovenia

Abstract

Abstract The unstable economic conditions that have been in place in the Slovenian and international construction markets reveal the problem of a disproportionate increase in the prices of construction materials and energy products. Such increases will therefore result in higher costs of construction services, which would ultimately affect the total value of the construction project. These events in turn bring uncertainty to the construction project and would negatively impact the business of construction companies and investors. Legal and construction practices have so far developed various ways to regulate contract changes arising due to unforeseen market conditions. The present paper offers a contribution to the contract price change solution during the construction phase. The introduction first presents the measures and guidelines that deal with the differences in contract prices in Slovenia and some other countries. Then, various methods of calculating price differences that have emerged in current Slovenian practice are described. As a result, a proposal for a hybrid method of monthly price difference calculation is presented. The hybrid method represents a balanced solution resulting from the unforeseen increase in construction material prices on the market and is applicable to all construction projects. The three methods, i.e., a calculation method, a method based on the GZS-ZGIGM index, and a hybrid method, are applied to a real example of a public contract. The calculation of the price valorisation, represented as an index of the recognised price increases of contract works, is carried out. The results are compared, and further solutions are proposed.

Publisher

Walter de Gruyter GmbH

Reference31 articles.

1. Alfreahat, D., & Sebestyén, Z. (2021). A construction–specific extension to a standard project risk management process. Organization, Technology and Management in Construction, 14(1), pp. 2666–2674.

2. Best IT d.o.o. (2024). Blist [Computer program]. Available at https://www.best.si/blist/.

3. Beti, I. (2021). Gradevinari: Zbog podivljalih cijena gradevinskog materijala mora intervenirati država! Večernji list. Available at https://www.vecernji.hr/vijesti/gradevinari-zbog-podivljalih-ci-jena-gradevinskog-materijala-mora-intervenirati-drzava-1519658 [accessed 15 January, 2024].

4. Chamber of Commerce and Industry of Slovenia and Chamber of Craft and Small Business of Slovenia. (2020). Special Construction Practice Code 2020, 1st edn. Ljubljana. https://www.ozs.si/datoteke/ozs/sekcije/Janko%20Rozman/Sekcija%20gradbincev/Posebne%20gradbene%20uzance%202020_OZS.pdf

5. Chamber of Commerce and Industry of Slovenia, Chamber of Construction and Building Materials Industry of Slovenia. (2022). Indeksi za obračun razlike v ceni gradbenih storitev 3, Ljubljana.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3