Effects of lagging projectification in the public sector on realizing infrastructure projects

Author:

Wagner Reinhard F.1,Radujkovic Mladen1

Affiliation:

1. Alma Mater Europaea - European Center Maribor , Slovenska 17 , Maribor ( Slovenia )

Abstract

Abstract The public sector in Germany lags behind the economy in terms of projectification, i.e., the prevalence of projects and experience in applying project management. This has significant implications for realizing complex infrastructure projects in which the public sector is involved as one of the main actors. Nowadays, projectification represents a particular way of thinking about how to embrace a series of dynamic and challenging changes, design them, and implement them effectively for the benefit of society. A quantitative study of projectification in society in Germany was the starting point for our research, the results of which we compared with data from earlier studies of projectification in the economy. Using an interpretative case study drawing on insights from the Berlin Airport, we analyzed the impact of lagging projectification in the public sector in Germany on realizing infrastructure projects to propose suitable approaches. The results of this case study reveal significant effects of lagging projectification in the public sector of Germany on realizing infrastructure projects. In the case of the Berlin BER Airport, an inadequate governance system led to a 9-year delay in the completion date and a 250% overrun of costs directly attributable to the project. This could have been avoided by involving the private construction industry more collaboratively, by building on previous experiences gained, and by a more cooperative way of project planning and implementation. To guide future research, hypotheses are derived that can be used to analyze the underlying problem in greater depth and to derive recommendations for action.

Publisher

Walter de Gruyter GmbH

Subject

Management of Technology and Innovation,Organizational Behavior and Human Resource Management,Strategy and Management,Building and Construction,Civil and Structural Engineering

Reference78 articles.

1. Aubry, M., & Lenfle, S. (2012). Projectification: Midler's footprint in the project management field. International Journal of Managing Projects in Business, 5(4), pp. 680–694.

2. BMVI (2015). Reformkommission Bau von Großprojekten. Endbericht. Available at https://www.bmvi.de/SharedDocs/DE/Publikationen/G/reformkommission-bau-grossprojekte-endbericht.pdf?__blob=publicationFile [accessed 18 December, 2021].

3. BMVI (2016). The 2030 Federal transport infrastructure plan. Available at https://www.bmvi.de/SharedDocs/EN/publications/2030-federal-transport-infrastructure-plan.pdf?__blob=publicationFile [accessed 18 December, 2021].

4. Braun, T., & Sydow, J. (2019). Selecting organizational partners for interorganizational projects: The dual but limited role of digital capabilities in the construction industry. Project Management Journal, 50(4), pp. 398–408.

5. Bundesbank (2021). The current economic situation in Germany. Available at https://www.bundesbank.de/resource/blob/879652/23494ecbb6da96f19619abd640318460/mL/2021-11-ueber-blick-data.pdf [accessed 12 December, 2021].

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3