Impact of project procurement systems on performance of Rwandan building construction projects
-
Published:2023-01-01
Issue:1
Volume:15
Page:221-232
-
ISSN:1847-6228
-
Container-title:Organization, Technology and Management in Construction: an International Journal
-
language:en
-
Short-container-title:
Author:
Esperance Umuhoza1, Sung-Hoon An1
Affiliation:
1. Department of Architectural Engineering, Daegu University , Gyeongsan-si, Gyeongsangbuk-do , South Korea
Abstract
Abstract
Delivering a construction project successfully is associated with the procurement system used. In other words, the selection of the appropriate system can guarantee the success of the construction project. Therefore, this paper evaluated and compared the effects of the most-utilised project procurement systems on the key performance criteria in the Rwandan building construction projects such as time, cost, quality and scope. A questionnaire survey was conducted among contractors, consultants and clients, and a total of 73 questionnaires were used for the analysis. The survey results, analysed by using statistic method, discovered that the traditional procurement system of design-bid-build (DBB) is the most-employed system in Rwanda. Also, it was revealed that in the Rwandan building construction industry, the construction management (CM) system was identified as a system that performs better for more objectives than others. Specifically, the results showed that owner direct force (ODF) is suitable for cost effectiveness, design and build (DB) system is better for time performance, and CM performs better for both scope and quality achievement. This study will facilitate Rwandan construction practitioners to be able to choose the appropriate option that suits the main objectives of their projects in order to reduce risks resulting from the use of unrelated procurement systems.
Publisher
Walter de Gruyter GmbH
Subject
Management of Technology and Innovation,Organizational Behavior and Human Resource Management,Strategy and Management,Building and Construction,Civil and Structural Engineering
Reference28 articles.
1. Abdul Rashid, R., Mat Taib, I., Wan Ahmad, W. B., Nasid, M. A., Wan Ali, W. N., & Mohd Zainordin, Z. (2006). Effect of procurement systems on the performance of construction projects. In: Conference, June 21-24, Padang, Indonesia, pp. 1–13. 2. Alaeddin, G., & Nuhu, B. (2016). The impact of design-bid-build procurement methods on project performance in Libya. KICEM Journal of Construction Engineering and Project Management, 6(2), pp. 16–23. 3. Alhazmi, T., & McCaffer, R. (2000). Procurement system selection model. Journal of Construction Engineering and Management, 126(3), pp. 176–184. 4. Ameyaw, C. (2009). Comparative performance evaluation of the traditional design-bid-build(DBB) and design-build (DB) procurement systems in Ghana. B.Sc. in quantity surveying dissertation, Federal University of Technology, Akure, Ghana. 5. Ashworth, A. (2001). Contractual Procedures in the Construction Industry, 4th edn. Longman, England.
|
|